Brand Logo

Contact Ram Board Project Support

Request a quote, locate a distributor lane, or ask for coverage takeoffs. This page pairs site information with a full inquiry form—unlike the compact quote modal.

Reply windowWithin 1 business day
Desk hoursMon–Fri 8:00–17:00 PT
Map illustration of Ram Board Benicia California support region

Visit / Mail

Ram Board Project Desk
Benicia Industrial Park
Benicia, CA 94510, USA

Hours

Monday–Friday: 8:00am–5:00pm PT
Saturday: distributor pickup by appointment
Sunday: closed

The project desk coordinates temporary floor protection boards, rolls, and seam tape inquiries. Distributors handle local inventory pulls, while questions about impact resistance, recycled content percentage, and VOC emissions belong here so your submittal language stays consistent across phases. Social updates and product bulletins also post through our LinkedIn channel for trade partners.

Tell Us About Your Jobsite

Include square footage, floor finish type, remaining trade weeks, and whether pathways stay occupied. Note delivery dates if they are fixed.

  • Coverage takeoffs with waste factors by finish
  • Distributor availability for staged deliveries
  • GREENGUARD Gold and recycled content notes

Prefer phone? Call +1 (800) 726-2673 on weekdays. Prefer drawings first? Describe attachments in the message field and mark “takeoff pack” so the desk routes correctly. Either path reaches the same team that supports ramboardbuilding.com inquiries.

When owners weigh green certification paperwork against schedule pressure, say so in the form—we will list which VOC emissions worksheets we can populate from product data versus which require your sustainability consultant.

For healthcare or hospitality corridors that stay open, note slip resistance expectations and public path hours so we can flag traffic-class boards before kraft paper is purchased by mistake. If your superintendent is still choosing between reusable floor protection and single-use paper, request a side-by-side pack with abrasion resistance, dimensional stability, and service life expectancy notes for the covering period rather than a single SKU push.

Renovation scopes should mention existing floor finishes and wet-work calendars. Water absorption staging rules and moisture vapor transmission tips for newly installed LVT travel with the same reply so flooring trades are not left waiting on a second email thread.